Make the workplace operational—not just fitted out.

UPNX coordinates the electrical, network, AV, security and migration interfaces that determine whether a new workplace opens ready for business.

Project triggers
  • New office or regional headquarters
  • Lease expiry or consolidation
  • Technology refresh during fit-out
  • Critical move weekend or phased cutover

01

UPNX coordinated scope

  • Power and critical-power coordination
  • Structured cabling, LAN, WAN and Wi-Fi
  • Meeting-room AV and collaboration systems
  • Access control, CCTV and security interfaces
  • Migration, cutover, testing and handover

02

Key deliverables

  • Interface and responsibility matrix
  • Coordinated implementation programme
  • Migration and cutover plan
  • Testing and commissioning records
  • Handover tracker and close-out pack

Delivery process

Connected from assessment to handover

  1. 01Assess
  2. 02Coordinate
  3. 03Install
  4. 04Integrate
  5. 05Commission
  6. 06Hand over

Project evidence

Reference delivery scope in corporate environments.

Each case presents owner-approved scope and coverage only. Concept visuals are clearly disclosed and never presented as site photography.

Cinematic concept of engineering and technology teams preparing a corporate headquarters relocation
Concept visual

Canada Goose

Asia headquarters relocation

One coordinated reference scope spanning project management, electrical, IT and network, AV, security, relocation, testing and handover.

View details

FAQ

Frequently asked questions

When should UPNX join a relocation project?

Ideally before design freeze, so power, network, AV, security and migration interfaces can be resolved before procurement and site installation.

Can UPNX work with an appointed designer or project manager?

Yes. The designer or consultant can retain the client and design role while UPNX owns the agreed engineering execution, integration, testing and handover scope.

Does UPNX manage the physical move?

UPNX can coordinate the technology and workplace-system migration, cutover and relocation interfaces. The exact mover, packing and logistics scope is defined project by project.